    Help on the first test

    Hello,

    I am quite new at OpenSTA and would like some help in defining the first test.

    I have recorded the first scenario and now want to create the test.
    I want to have 200 concurrent users but want to start with 5 users and then increase the number of users with 5 per minute. When the concurrent number of users have reached 200 I want to let them running the scenario 20 times or by time limit (let say 1 hour).

    How can I define such test?
    Would be very pleased to get a kick-start.
    BR
    4 Integration

  2. #2
    Member
    Join Date
    Sep 2006
    Posts
    33
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Help on the first test

    Hi
    In Test there is are three things named
    1)No.of user per batches
    2)Time Interval between Batches
    3)Ramp up time.
    so u can use this FOr 5 users starting and than increase the 5 users every minute.
    In ur case this should be
    1)No.of user per batches : 5
    2)Time Interval between Batches : 60
    3)Ramp up time. : 5



    One more thing is that iteration is also over there.U can specify it as 20 in terms of iteration not in terms of time.

    Or speciffically u can Write Do statement in the scrpit part for iteration

    like

    Do iterate = 1, 20
    ur scrpit to be oterated
    End Do

    I think u got the answer.

    Have a nice Day Ahead.

  3. #3
    Senior Member
    Join Date
    Nov 2006
    Posts
    103
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Help on the first test

    Hi,

    In the test scenario, create a new test. According to the scenario you need to configure as follows,

    Total Number of Virtual users for this task group : 200
    Interval between batches : 0 ( Actually this is the stable period between the ramp up )
    Time Interval between Batches : 5
    Ramp up time(sec) : 60

    It will keep on running, So, please calculate the time as per the scenario so that you can keep 200 users stable for 20 min and manually stop the run.

    In your case, 40 minutes it will take to reach 200 users Load. Then, stable for 20 minutes means, “ It will takes 1 hour for the complete run”.

    Iteration can specified from the beginning of the run only. It can't able to specify during the stable period. So, do the iterative 20 times and do the run repeatedly and stop the run manually.

    Iterative syntax as follows,

    DO Times = 1,20,1
    your script need to be placed here
    ENDDO

    Performance Team,
    readytestgo pvt ltd.

 

 

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Search Engine Optimisation provided by DragonByte SEO v2.0.40 (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.
Resources saved on this page: MySQL 10.71%
vBulletin Optimisation provided by vB Optimise v2.7.1 (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.
User Alert System provided by Advanced User Tagging v3.3.0 (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.
vBNominate (Lite) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.
Username Changing provided by Username Change (Free) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.
BetaSoft Inc.
Digital Point modules: Sphinx-based search
All times are GMT -8. The time now is 01:31 PM.

Copyright BetaSoft Inc.