I currently have a visual test ("main") that is using an ActiveData file. In this visual test, I am looping through each row of the ActiveData, and with each row I am calling several other visual tests ("subscripts"). Each of these subscripts that are called each iteration are also being driven by an ActiveData file. I am not doing any looping in the subscripts because I only want them to be run once per iteration of the main script. As it currently stands, my subscripts are always using the first row of ActiveData because they do not contain any loops, but what I need them to do is run the next ActiveData row during each iteration of the main script. When the main script is on row 6, I want all of the subscripts to also be using row 6 of ActiveData. Is this possible with a Visual Test?