In my test plan there are several Thread Groups.
In Thread Group I tick the "Scheduler" checkbox and set Duration = n seconds.

The problem is: when sample response time is too long, thread is not stopped when Duration exceeds, jmeter just waits for response to come...
So, is there a way to stop all threads of current group when the Duration time exceeds ?

Thanks in advance.