i am using rational test manager to run scripts captured through robot for simultaneous virtual users. I have inserted a synchronisation point in my user group to introduce ramp up time for the virtual users. However after a test completes test manager gives a message which says
"specified load was never achieved "
moreover there are entries in server logs for each simulation thereby indicating that the server was indeed loaded.. for e.g for a test with x simultaneous users there are x entries in the server logs... kindly help

thanks in advance