    Verification Points in Rational Robot.

    I am using Rational Robot to automate my product. There are tonnes of reports in the product which I have to test after every build for the data in it. The problem is, I can't use Window image VP since the report position is not fixed. I want to capture the data contained in it which varies from graphs, charts to other numeric data. Which VP should I use? Is there any other method?

  2. #2
    SQA Knight
    Join Date
    Sep 2001
    Location
    Bangalore,India
    Posts
    2,549
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Verification Points in Rational Robot.

    Hey,
    You can put this post into Robot forum..........
    Thanks & Regards,
    Palani.
    http://tips-testing.blogspot.com/index.html
    Quote: Donít hesitate to initiate!

  3. #3
    Senior Member
    Join Date
    Jul 2001
    Location
    Montreal, QC, Canada
    Posts
    366
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Verification Points in Rational Robot.

    Do your reports have the ability to export to file?

    If so, i would export them to file and validate against a baseline file.

    Max

  4. #4
    Junior Member
    Join Date
    Sep 2003
    Location
    Pune
    Posts
    2
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Verification Points in Rational Robot.

    Thankyou.
    I tried using the export option and then comparing the files. But now the problem is my report also exports the system Time when it has been run and this causes a difference in the files.

  5. #5
    Senior Member
    Join Date
    Jul 2001
    Location
    Montreal, QC, Canada
    Posts
    366
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Verification Points in Rational Robot.

    If it were me, since it's the data which is important, i'd either change my baseline to change the format of the date in the baseline from for instance 12/02/2003 to be @@/@@/@@@@ and once you've exported the actual, you could parse the file to find the date, 1) you could verify it's the system date then and 2) replace the date with the same @@/@@/@@@@ and then do the comparison.

    Max

 

 

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Search Engine Optimisation provided by DragonByte SEO v2.0.36 (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
Resources saved on this page: MySQL 11.54%
vBulletin Optimisation provided by vB Optimise v2.6.4 (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
User Alert System provided by Advanced User Tagging v3.2.8 (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
vBNominate (Lite) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
Username Changing provided by Username Change (Free) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
BetaSoft Inc.
Digital Point modules: Sphinx-based search
All times are GMT -8. The time now is 02:46 AM.

Copyright BetaSoft Inc.