User ("Brough,Adrian(IRSOLUTIONS)") posted:

Hi All,

My company has just upgraded to 2001, ad for the first time we will be
attempting to follow the proper methods of linking our requirements up to
our (mainly) manual tests. We have a huge number of requirements in Req Pro.
The problem is, when I attempt to attach a Test Input (Requirement), it
takes an unfesiably long time (approx 15 min) for the list of test
requirements to appear from Req Pro. Although this is bad enough, at this
point, we can only attach one requirement at a time. Is there any way we can
do multiple selects of Test Requirements?

Has anyone else had any problems with slow response times from the Req Pro

Thanks, Adrian Brough