Results 1 to 3 of 3
  1. #1

    QTP and Performance Center Integration

    Hello, Does anyone know if it is possible to use the scripts recorded with quick test pro in Performance Center instead of Quality Center?

  2. #2

    Re: QTP and Performance Center Integration

    I think it should be possible. My team does work in that but i have not interaction on this point with them as of yet.

  3. #3
    Junior Member
    Join Date
    Mar 2008
    Dubuque, IA, USA

    Re: QTP and Performance Center Integration

    You can not run tests from QT Pro in Performance Center. Scripts for Performance Center which still uses the Loadrunner engine must be recorded in VUGen (Virtual User Generator) which creates scripts in C.
    All Performance Center accomplishes is place a wrapper around Loadrunner which allows for the management of licenses, load generators, and allows scheduling of Controllers. It still uses Loadrunner as its driving engine and relies on VUGen scripts for building individual scripts.

    <font color="green">"We need a QT Pro guru to spend extra time learning everything possible about QT Pro. So who has cracked open the User Guide?"</font>

    <font color="blue">"I have"</font>

    <font color="green">"Good! You are now the QT Pro guru. Go forth and automate."</font>



Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
BetaSoft Inc.
All times are GMT -8. The time now is 03:40 PM.

Copyright BetaSoft Inc.