    Copy test cases from one project to another

    Hi Guys,

    I'm trying to work out an automated way to copy test cases from the test plan module to the same folder structure in a different project. In particular Quick Test Professional tests. I have been able to write code that will save all the quicktest tests to the folder system but have not been able to work out a way as yet to save the tests back up to Quality Center in a different project.
    I was hoping there would be an eaiser way to copy the tests accross. we are using QC 9.2
    Any ideas would be appreciated

    Thanks

    Gav

  2. #2
    Super Member Jonty's Avatar
    Join Date
    Jan 2007
    Location
    India
    Posts
    1,266
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Copy test cases from one project to another

    From a manual test case standpoint, copying the folder, from one project to another helps.

    If from automation script standpoint, there can be two ways :

    Download the script to local disk, Use QTP AOM and QC-API to upload scripts back into another project.

    Check the QC forum for more information on the same.

    I am not sure if project dump from one to another will help in this case, post the same thread in the QC forum, there may be some QC admins, who would have more information
    Cheers
    Jonty..
    -- Here to Learn and share ---

  3. #3
    Member
    Join Date
    Mar 2006
    Location
    Canberra
    Posts
    206
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Copy test cases from one project to another

    Thanks Jonty,

    I have worked out a way to download all the scripts to the local disk. It is uploading them back up which I'm having trouble with. Do we have to open each script in QTP and save them into the new QC project or can then be upload straight into a QC Folder.

    Regards

    Gavin

  4. #4
    Moderator
    Join Date
    Jul 2005
    Location
    Delhi
    Posts
    15,575
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    7 Thread(s)
    Total Downloaded
    0

    Re: Copy test cases from one project to another

    Yes Gavin. But I believe a QC admin may be able to do such things easily for you. Check with them

 

 

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Search Engine Optimisation provided by DragonByte SEO v2.0.36 (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
Resources saved on this page: MySQL 12.50%
vBulletin Optimisation provided by vB Optimise v2.6.4 (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
User Alert System provided by Advanced User Tagging v3.2.8 (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
vBNominate (Lite) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
Username Changing provided by Username Change (Free) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
BetaSoft Inc.
Digital Point modules: Sphinx-based search
All times are GMT -8. The time now is 12:26 PM.

Copyright BetaSoft Inc.