Is there a way to run consecutive load runner scenarios with test director? I want to run a scenario and have the next one start when it finishes? Is this possible? we dont have test director yet. Has anyone had the need to dosomething like this.

[ 04-12-2005, 08:15 AM: Message edited by: pm01 ]