We recently configured our QC Environment to run in a two-server cluster, (Win2k3) with an external Oracle instance, and upgraded the systems to 9.2 in hopes of using the risk analysis features. The HP consultant helped us through all the logistics, and everything has been set up as suggested. We are seeing consistent problems with logging into this system now even after the initial client-side load. Often iE will completely lock. Performance monitor shows 100% CPU while Quality Center is loading. This system is basically unusable at this point. HP has issued patch 5, but this didn't help at all. Has anyone else out there experienced similar problems with 9.2, and were you able to get them resolved? I will also add that HP knows that there is a problem. The support people confirmed it with the consultant while he was on the phone with them.