SPONSORS:






User Tag List

Thanks Thanks:  0
Likes Likes:  0
Dislikes Dislikes:  0
Results 1 to 4 of 4
  1. #1
    Member
    Join Date
    Nov 2007
    Posts
    48
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Change the order in New defect field..

    Hello..

    I would like to know how to change the order of the fields.
    For example i want to put a specific field under another specific field.

    Many Thanx
    DOvi

  2. #2
    Member
    Join Date
    Mar 2007
    Location
    Boston, MA
    Posts
    98
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Change the order in New defect field..

    Consult the administrators guide.
    Part II of the guide covers customization.
    Beantown Tester
    Go <font color="Red">Red Sox</font>

  3. #3
    Advanced Member
    Join Date
    Aug 2004
    Location
    Wellington, New Zealand
    Posts
    810
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    1 Thread(s)
    Total Downloaded
    0

    Re: Change the order in New defect field..

    Dovi,
    There are two places you can do this:

    #1: GUI tool:
    Cutsomize &gt; Set Up Workflow &gt; 'Script Generator - Add Defect Field Customisation'

    #2: Workflow Code
    Cutsomize &gt; Set Up Workflow &gt; Script Editor &gt; Defects Module Script &gt; Sub Defects_Bug_New

    Using the "ViewOrder" property:

    Bug_Fields("&lt;fieldname&gt;").ViewOrder = x
    Bug_Fields("&lt;fieldname&gt;").ViewOrder = y
    Bug_Fields("&lt;fieldname&gt;").ViewOrder = z
    Bug_Fields("&lt;fieldname&gt;").ViewOrder = etc..

    Remember that in QC field order always works this way:

    1 2
    3 4
    5 6
    7 ..

    Hope this helps
    Regards,

    Alex
    ... just another Tester ...

  4. #4
    Apprentice
    Join Date
    Jun 2001
    Location
    london, uk
    Posts
    30
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Change the order in New defect field..

    Thanks Asher
    I followed your QC field order suggestion to arrange my Req_Fields ViewOrder and it worked superbly

 

 

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Search Engine Optimisation provided by DragonByte SEO v2.0.36 (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.
Resources saved on this page: MySQL 10.00%
vBulletin Optimisation provided by vB Optimise v2.6.4 (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.
User Alert System provided by Advanced User Tagging v3.2.8 (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.
vBNominate (Lite) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.
Username Changing provided by Username Change (Free) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.
BetaSoft Inc.
Digital Point modules: Sphinx-based search
All times are GMT -8. The time now is 11:38 AM.

Copyright BetaSoft Inc.