    Scheduling the Multiple Test Sets in QC

    Hi,

    We are having multiple test sets in QC and we want to run these sets one after the other starting at the specified time.

    Is there any option is QC to achieve this?

    I know how to schedule single test set but i am not finding any option for multiple sets.

    Any body came across this situation?

  2. #2
    Junior Member
    Join Date
    Jun 2008
    Posts
    27
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Scheduling the Multiple Test Sets in QC

    Hi Vidya,

    I dont think there is a facility in QC to run different Tets Sets at specific time.
    But what you can do is select all the Tests from the Test Plan in one Test set and then you can schedule it accordingly.
    Regards
    Ashish

  3. #3
    Member
    Join Date
    Jun 2007
    Posts
    64
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Scheduling the Multiple Test Sets in QC

    As we want to test the application feature wise we are planning different sets.

    Any other way to achieve this?

  4. #4
    Junior Member
    Join Date
    Jun 2008
    Posts
    27
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Scheduling the Multiple Test Sets in QC

    There is no other way directly to do this.
    One thing you can do is:

    1) Make a new Test Set.
    2) Import all the Tests in new TEst Set
    3) Go to Execution Flow tab
    4) For the second Test RIght Click and go to TEst Run schedule
    5) In Execution condition you can give condition that if test1 is finished start test 2.
    6) Go to Time dependency and mention the date and time.
    Regards
    Ashish

  5. #5
    Junior Member
    Join Date
    Jun 2008
    Posts
    27
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Scheduling the Multiple Test Sets in QC

    Hi Vidya,

    Did it worked?
    Regards
    Ashish

  6. #6
    Member
    Join Date
    Jun 2007
    Posts
    64
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Scheduling the Multiple Test Sets in QC

    Thank you Ashish for your inputs.

    But the client wants to track of which feature of the application failed and each test set results should be e-mailed automatically to responsible persons.

 

 

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Search Engine Optimisation provided by DragonByte SEO v2.0.36 (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
Resources saved on this page: MySQL 11.54%
vBulletin Optimisation provided by vB Optimise v2.6.4 (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
User Alert System provided by Advanced User Tagging v3.2.8 (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
vBNominate (Lite) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
Username Changing provided by Username Change (Free) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
BetaSoft Inc.
Digital Point modules: Sphinx-based search
All times are GMT -8. The time now is 10:49 PM.

Copyright BetaSoft Inc.