    Is there a difference between STP for new project and STP for a new release

    I am in the process of writing templates for QA purposes.
    The most common one is of course an STP.
    I have already wrote one from several templates that I have collected. However I am facing a problem that you might have a simple solution for me.
    The STP template should cover 2 aspects. [1] test plan for new project [2] Test plan for a new release ( this is usually a subset of No. 1 )

    Now I have several questions:

    1. Does the name STP refer to both aspecs that I mentioned above ? meaning test plan for a new release is called STP or something else???

    2. Is it right to create one template for both aspects or shall I create 2 different templates ??as there is a slight diffrent between them.

    3. According to QA methodology what is the right thing to do ?

    I would appreciate your prompt response.

    Limor Yaakov.
    QA Manager

  2. #2
    Senior Member
    Join Date
    Jan 2003
    Posts
    1,898
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Is there a difference between STP for new project and STP for a new release

    Limor,

    You will be performing system testing on both types of projects, therefore one basic STP template should be fine.

    You are not obligated to fill in every field, if all of the information is not applicable (or useful to the team), nor are you prohibited from adding sections that are pertinent to certain projects. A template should just be a guideline.

    - Linda

  3. #3
    Member
    Join Date
    Apr 2002
    Location
    Bangalore India
    Posts
    39
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Is there a difference between STP for new project and STP for a new release

    Limor

    The major difference will come on the impact of the new requirements in the existing application. You should develop an Impact Analysis Checklist which should bring out the impact of the additional/enhanced requirements in the application. The areas impacted should be revisited for revision/review of test cases and scripts.

    If you identify the impacted areas, then you have apply all your regular processes for performing the testing.

    ==============================================
    GUNA
    CSQA PMP
    QA Project Manager

 

 

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Search Engine Optimisation provided by DragonByte SEO v2.0.36 (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
Resources saved on this page: MySQL 10.71%
vBulletin Optimisation provided by vB Optimise v2.6.4 (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
User Alert System provided by Advanced User Tagging v3.2.8 (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
vBNominate (Lite) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
Username Changing provided by Username Change (Free) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
BetaSoft Inc.
Digital Point modules: Sphinx-based search
All times are GMT -8. The time now is 02:33 AM.

Copyright BetaSoft Inc.