    Acceptance criteria

    Question to forum:
    What are the good examples of acceptance criteria or setting the cut-offs for testing, as for example:
    1. Test case Documents should be ready 2 weeks before testing
    2. No changes will be accepted after final release.
    3. Changes after this release will be managed as...
    Can you suggest such cut-offs of test phases within releases which can be included for test planning. (system, integration and user acceptance test planning)

    [ 07-06-2006, 07:37 AM: Message edited by: Jatin Dhawan ]

  2. #2
    Member
    Join Date
    Apr 2005
    Location
    Michigan
    Posts
    81
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Acceptance criteria

    There seems to be a couple of questions in your one question but I'll give it a go:

    You should definitely have deadlines and timelines for locking down the requirements and design of an application. If you don't "lock down" those two things you can get major scope creep and then your cost and timeline goes right out the window.

    There should be a cut off for new requirements and major design changes! Then if new requirements or functionality are found that are needed in the current release, they should be handled as a change control which will affect the budget and project schedule accordingly.

    When you are short on time you could always go the Risk-Based Testing way and hit the most important components first.

    As far as User Acceptance Testing goes you should always use the requirements to base what gets Accepted by the clients.

  3. #3
    Junior Member
    Join Date
    Feb 2003
    Location
    Bombay, MH,India
    Posts
    18
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Total Downloaded
    0

    Re: Acceptance criteria

    As far as acceptance cut-offs go - they are determined differently based on 1) you having your own development team, 2) you are the vendor providing testing services or 3) you are the contracting party who has hired a test lab for its testing activities.

    Can you please specify in which of the above you fit into ?
    -------------

    Aakash Vakil

 

 

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Search Engine Optimisation provided by DragonByte SEO v2.0.36 (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
Resources saved on this page: MySQL 10.71%
vBulletin Optimisation provided by vB Optimise v2.6.4 (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
User Alert System provided by Advanced User Tagging v3.2.8 (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
vBNominate (Lite) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
Username Changing provided by Username Change (Free) - vBulletin Mods & Addons Copyright © 2016 DragonByte Technologies Ltd.
BetaSoft Inc.
Digital Point modules: Sphinx-based search
All times are GMT -8. The time now is 01:47 PM.

Copyright BetaSoft Inc.